Pharmaceutical multinational located in the interior of São Paulo, in the process of expanding its manufacturing facilities to serve the international market. The electricity needed to support this expansion was made possible through the elevation of voltage class, with the construction of a Power Substation and approximately 5 km of High Voltage Distribution Line to meet an average consumption of 3.2 MW, whose solution was designed and implemented by the IBS Energy Group.
Solution
- Migration to the free electricity contracting environment (ACL);
- Management in the free market and representation in the CCEE and Regulatory Agencies
- Design, construction, and commissioning of a Substation and 5 km High Voltage Distribution Line;
- Elevation of voltage class;
- Long-term contracting of electricity.
- Project payback: 36 months.
The IBS Energy Group has assumed all responsibilities for implementing the solutions to meet the Client.